Fig. 1

Viability of PCBUS over a period of 13 days; Triton X-100 represents the result of the negative control; the red dotted line symbolised a viability limit of 70%; n.m.: not measured; data are given as mean + standard deviation of 7 PCBUS from 4 udders each